Registration Rates
A full conference registration includes attendance to the conference sessions, entry to the exhibition, a ticket to the conference dinner, and catering.
Add-on Events
Conference Dinner
$195
Tuesday 10 Nov 2026
Technical Tour A - Brisbane Metro Depot
$65pp
Monday 09 Nov 2026
Technical Tour B - Greenbank BESS
$65pp
Monday 09 Nov 2026
Payments
Conveniently, all payments can be made online at registration using Visa and Mastercard.
Please note that all costs mentioned above are quoted in Australian dollars (AUD) and include the Goods and Services Tax (GST).
Cancellation Policy
Please note that the organisers retain the right to cancel or modify optional activities in the event that minimum participation numbers are not met.
Technical Tour A
Brisbane Metro Depot
Cost:
$65pp
Date:
Monday 9 November 2026
PPE:
Will be supplied on site - All delegates must wear closed in shoes for this tech tour
Arrival Time:
12 noon - Meet at Royal International Convention Centre drive through area
600 Gregory Terrace, Bowen Hills QLD 4006
Departure Time:
12.15pm - Depart for Brisbane Metro Depot
(Please note the coach will not wait- so please be there early for a prompt departure)
Return:
3.00pm - Depart for Royal ICC
Please have lunch prior to joining the Technical Tour
Water and a light snack will be provided on the tour.
Brisbane Metro Depot
The state-of-the-art Brisbane Metro Depot was completed and opened for metro services in October 2024
More than 400,000 hours of construction transformed the 10-hectare site at Rochedale into Australia’s largest electric bus depot for the Brisbane Council’s fleet of electric metros.
The depot has 65 chargers installed, including five fast chargers, more than 2300 solar panels and onsite maintenance and staff facilities.
The depot is the largest and most advanced facility of its kind in Australia and its location at School Road will allow the metros to integrate seamlessly into the South East Busway.
The depot has a 5 Star Green Rating for its sustainable design with the site to use harvested rainwater and recycled water for vehicle washing.
The more than 2300 solar panels at the depot will each year provide enough clean energy equivalent to the power consumed by 280 homes and avoid carbon emissions equivalent to taking more than 500 cars off the road.
Construction Fast Facts:
- 2300 solar panels installed
- 60 slow chargers and 5 fast chargers
- More than 500 tonnes of steel
- 25 kilometres of electrical and communications cabling
- 3 football fields worth of concrete laid
- 60 Olympic swimming pools of materials removed
- 400,000 hours of construction works
Site tour will be 2 hrs - PPE will be supplied on site - all delegates must wear closed in shoes for this tech tour.
Technical Tour B
Greenbank BESS
Cost:
$65pp
Date:
Monday 9 November 2026
PPE:
All delegates must wear the listed PPE for this tech tour.
- Either a high visibility day/night shirt or long-sleeved shirt with high visibility vest,
- long trousers,
- safety footwear (hard cap boots),
- protective eyewear,
- hat for outdoors if desired (in case it’s sunny).
Arrival Time:
12.15pm - Meet at Royal International Convention Centre drive through area
600 Gregory Terrace, Bowen Hills QLD 4006
Departure Time:
12.30pm - Depart for Greenbank BESS
( Please note the coach will not wait- so please be there early for a prompt departure)
Return:
4.00pm - Depart Greenbank BESS to return to Royal ICC
Please have lunch prior to joining the Technical Tour
Water and a light snack will be provided on the tour.
Greenbank BESS
The Greenbank Battery is a large-scale battery in the Logan City Council area. The battery has a discharge capacity of 200 megawatts and can store 400 megawatt hours of energy. This means during the evening peak demand period, the battery can power 66,000 homes for up to two hours before needing to recharge.
The battery comprises 108 Tesla Megapack 2XL units. Each Megapack is made up of the battery module, paired with its own inverter and associated heat management systems and wiring. The Megapack is one of the safest battery storage products of its kind. Units undergo extensive fire testing and include integrated safety systems, and specialised monitoring software.
The Greenbank Battery is CS Energy’s second battery project. CS Energy also owns the Chinchilla Battery, which commenced commercial operations in 2024.
Site Tour will be 2 hrs in duration.
Delegates Registration
All delegates that register for this tour must completed an Access Authorisation form see link:
If you are unable to to open the form via the button below.
Please email Deb for a copy
Please complete this form and return to deb@purelycreativesolutions.